Wake Me Up When It's All Over - A Follow Up

The second line is when I'm wiser and I'm older.  

The lift station problem has been diagnosed. A second pump needs to be replaced and the sooner the better. Friday AM the repair process begins.

 As of 5:30PM, there is a new pump and floats have been installed. And while this is a big problem several hundred feet from the lift station, an expensive development of town houses has experienced a flooded garage. 

Yes, it has rained a lot for the last ten days. And the "not so poor people" in the million-dollar townhouses have had a virtual army of workers trying to mitigate the damage caused by the flooding. 

The maintenance and repair of the lift station that disposes of sewage and gray water is an absolute necessity.

I don't know how long the repairs will last, but the cost per unit is about $100.00.  Many of the issues regarding the pumps relate to flushing stuff like baby wipes and paper towels and even some less biodegradeable items.

Any strategic plan to harden this system is different from the emergency repairs that were done today.

Comments

Popular posts from this blog

Two Months and Eight Days

Internet Dust Ups

What Is Official These Days?